|
1. Diener's streetscape and
parking lot redesign
3. Redesign of Southbound Rhode
Island Ave. (The Roof Center to Wallace Ave.
4. Redevelopment proposal for
underutilized property on Webster St. as Medical Park
5. Redesign proposal for vacant
lots on 41st Street
6. Redesign proposal for boarded
up property at 4536 41st Street
7. Proposal for Wallace Rd.,
between 41st St. and Banner St. as new "Market Center"
|
|
8. Design for safety (CPTED)
redesign plan for North Brentwood
9. Redesign strategies for
A.M.E. Zion Church and St. James Church
10. Infill proposals for 3 vacant
lots located on Webster as "North Brentwood Senior Center"
11. Alternative proposal
#1 for siting of new First Baptist Church incorporating
"Town Green"
11. Alternative proposal #2 for
siting of new First Baptist Church incorporating "Town Green"
|
|
12.
Town Hall/Museum Entry Park
13. Redesign of community
playground/tennis court recreational complex
14. Redesign of open space at
Window Rd. and 39th Place
15. Redesign of Open Space adjacent
to levee at the Northwest Branch of the Anacostia River
16. 40th St. Streetscape Redesign
18. Wallace St. streetscape
redesign
|